• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Place of Origin: Shanghai, China (Mainland)
  • Brand Name: Go Green
  • Model Number: GPC02
  • Type: Modified Bitumen
  • Grade: First class quality
  • Softening Point: N/M
  • Color: Red, Yellow, Green, Blue, Orange, Brown and Grey
  • Paving Thickness: 1.0-1.5cm
  • Shelf Life: Unopened to six months
  • Package: 20kg bag and 1 ton bag

Packaging & Delivery

Packaging Details 20kg bag and 1 ton bag
Delivery Time Shipped within 14 days after payment

Go Green coloured asphalt / asphalt color coating for bicycle lane

 

 

Go Green Cold Mix Colored asphalt is a new patented high technology product, uses eco-friendly cold mix processing and significant ultra thin overlay technology, the material can be storaged and shelf life unopen up to six months. Its suitable for landscaping paving, sport and leisure, public parks and gardens, bus lane, bicycle path as well as light traffic driveway paving. The paving thickness is only 1.0-1.5cm, which greatly reduce the material cost. 

 

   

 

 

Different color avaiable

 

 

Outstanding Features


Go Green Micro-Paving Cold Mix Color Asphalt has some basic performances such as soft, easy to compact, water stability, long shelf time, excellent strength, construction at normal temperature, they are generally described as follows:

 

A. Cold mix technology. Paving thickness only 1.0-1.5cm.

B. Noise reduction, Anti-slip and Fog-proof.

C. Stick to the original pavement surface closely

D. Storage up to 6 month

E. Excellent resistance to water damage.

F. Environmental Protection

G. Construction time no limitation.

Different color available, lively colors protection 

 

Application Area

 

Package are available in 20kg bag and 1 ton bag

 

 

Step one:

 

Preparation

 

1.   The product construction temperate should be above 0°C, recommend to construct above 5 °C

 

2.   Clean the Debris of the road. The surface should be free of ice, standing water, snow, and loose material.

 

Step two:

 

Paving 1.0-1.5cm thickness by standard asphalt paver.

  

Step Three:

 

Compact the surface as soon as possible, after  1-2 hours, compact 4-5 times to guarantee the compaction without crashing aggregate.

 

Step Four:  

 

Close traffic completely after construction. till pavement surface is dry and hard, depends on the weather, usually open to traffic after 6-12 hours. 

 

 

 

Certification

 


 

Our Market

 

Our Service

 

 

Welcome to contact us, or call us 021-61053027, we will reply to any of your question at the earliest time.

 

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
China (Mainland) | Manufacturer, Trading Company
Transaction Level:
Supplier Assessments:
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $27,000
Learn More