Go Green Coloured Asphalt / Asphalt Color Coating for Bicycle Lane

FOB Reference Price:Get Latest Price
US $421-612 / Ton | 1 Ton/Tons (Min. Order)
Supply Ability:
1000000 Ton/Tons per Month
Port:
Shanghai
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shanghai, China (Mainland)
Brand Name:
Go Green
Model Number:
GPC02
Type:
Modified Bitumen
Grade:
First class quality
Softening Point:
N/M
Color:
Red, Yellow, Green, Blue, Orange, Brown and Grey
Paving Thickness:
1.0-1.5cm
Shelf Life:
Unopened to six months
Package:
20kg bag and 1 ton bag
Packaging & Delivery
Packaging Details
20kg bag and 1 ton bag
Delivery Time
Shipped within 14 days after payment

Go Green coloured asphalt / asphalt color coating for bicycle lane

 

 

Go Green Cold Mix Colored asphalt is a new patented high technology product, uses eco-friendly cold mix processing and significant ultra thin overlay technology, the material can be storaged and shelf life unopen up to six months. Its suitable for landscaping paving, sport and leisure, public parks and gardens, bus lane, bicycle path as well as light traffic driveway paving. The paving thickness is only 1.0-1.5cm, which greatly reduce the material cost. 

 

   

 

 

Different color avaiable

 

 

Outstanding Features


Go Green Micro-Paving Cold Mix Color Asphalt has some basic performances such as soft, easy to compact, water stability, long shelf time, excellent strength, construction at normal temperature, they are generally described as follows:

 

A. Cold mix technology. Paving thickness only 1.0-1.5cm.

B. Noise reduction, Anti-slip and Fog-proof.

C. Stick to the original pavement surface closely

D. Storage up to 6 month

E. Excellent resistance to water damage.

F. Environmental Protection

G. Construction time no limitation.

Different color available, lively colors protection 

 

Application Area

 

Package are available in 20kg bag and 1 ton bag

 

 

Step one:

 

Preparation

 

1.   The product construction temperate should be above 0°C, recommend to construct above 5 °C

 

2.   Clean the Debris of the road. The surface should be free of ice, standing water, snow, and loose material.

 

Step two:

 

Paving 1.0-1.5cm thickness by standard asphalt paver.

  

Step Three:

 

Compact the surface as soon as possible, after  1-2 hours, compact 4-5 times to guarantee the compaction without crashing aggregate.

 

Step Four:  

 

Close traffic completely after construction. till pavement surface is dry and hard, depends on the weather, usually open to traffic after 6-12 hours. 

 

 

 

Certification

 


 

Our Market

 

Our Service

 

 

Welcome to contact us, or call us 021-61053027, we will reply to any of your question at the earliest time.